A fixture is one building. A programme is a kind of building: "a secondary school has ten to eighteen classrooms, one or two science labs each with a prep room, a library and a canteen on the ground floor, two stairs and a lift". spacetope.programme.sample(name, seed) draws one brief from that description, and variations(brief, seed) perturbs a brief that already exists. Both are pure and deterministic in the seed.

Three uses: a benchmark suite per building type instead of a handful of fixtures; robustness sweeps, where a variation asks "does this generator still work if every room grows twenty percent"; and the training data the learning track needs, which is briefs by the thousand rather than by the dozen.

Programmes live in programmes/*.yaml. Four ship with the project: office, secondary_school, clinic, housing.

Using them

spacetope programme --list                                   # what exists
spacetope programme clinic --seeds 0-99 --out out/briefs     # a brief YAML per seed
spacetope programme clinic --seeds 0-9 --out out/briefs --variations
spacetope programme office --seeds 0-499 --dataset out/rows.jsonl   # dataset rows instead

In Python:

from spacetope.programme import sample, variations
brief, frontage = sample("clinic", seed=7)      # a Brief, and how hard it will be to build
if frontage.tight:
    ...                                          # its rooms want more corridor than the envelope allows
sweep = variations(brief, seed=7)                # {"scale": Brief, "widen": Brief, ...}

The format

name: secondary_school
levels: {min: 2, max: 3}            # or a plain number
level_height: 3.5
envelope: {area_factor: [1.7, 2.3], aspect: [1.8, 3.0]}
circulation:
  corridor: {w: 2.4, l: from_frontage}
  stairs: {count: 2, w: 3, l: 6}
  lifts: {count: 1, w: 2.4, l: 2.4}
  doors: {room: {w: 0.9, h: 2.1}, jamb: 0.1}
rooms:
  - {type: classroom, w: 8, l: 7, count: [10, 18], exterior: 1.0, level: any}
  - {type: science_lab, w: 10, l: 7, count: [1, 2], level: upper,
     attach: {type: prep_room, w: 4, l: 5, door: true}}
  - {type: wc, w: 4, l: 4, count_per_level: 2}
adjacency:
  - {between: [meeting, kitchen], p: 0.5, door: true}
tolerance: {room: 0.10, corridor: {l: [-0.5, 2.0]}}
key meaning
levels a number, or {min, max} drawn inclusively
envelope omit for no envelope. area_factor multiplies the busiest level's floor area, including the corridor and shafts; aspect is width over length. Either may be a range
circulation.corridor.l a length in metres, or from_frontage to derive it: half the metres of wall the busiest level's rooms want, narrow side on
circulation.stairs / lifts {count, w, l}, expanded into the list the brief format wants. Dropped on a single-level brief
rooms[].count a number or [lo, hi]. count_per_level repeats it on every level instead
rooms[].level any (the emptiest level), ground, upper, a number, or a list to choose from
rooms[].exterior the probability this room asks for an outside wall
rooms[].attach hang another room off this one, with a door by default. Chains: an attach may itself carry an attach
adjacency optional room-to-room wishes between two types, with probability p and an optional door
tolerance room is a symmetric fraction; corridor.l is a [lo, hi] pair of fractions
corridor_contacts default true: every room is given a contact with its level's corridor

Rooms are named type_NN. Every room is assigned a concrete level when it is drawn, because a room can only be told to open off corridor_<k> once its k is known, and that contact is what makes a brief buildable: without it the search has little reason to put a room on a corridor at all, and almost nothing verifies (measured 2026-10-04, PLAN §5). any sends a room to the emptiest level so the floors stay balanced.

Frontage: how hard will this brief be?

sample returns a Frontage alongside the brief. It compares the metres of corridor wall the busiest level's rooms want, narrow side on, with the two sides of the longest corridor the envelope allows. Above 85 percent the brief is tight, which is where the beam was measured to start failing in M15a.

It is a reading, not a refusal: a tight brief may still build, and the exact engine copes better than the beam. With the shipped programmes it rarely fires, because the corridor length is derived from the same demand. It earns its keep when an architect writes a fixed envelope that is too small for the rooms inside it.

Variations

variations(brief, seed) returns one perturbed brief per kind. A kind that cannot apply to a brief is left out rather than returned unchanged.

kind what it changes
scale every room 20 % larger or smaller
widen / narrow every room's tolerance to ±20 % or ±2 %
drop removes a room and its contacts
duplicate copies a room
stretch_envelope 25 % wider, 10 % shallower
undoor turns one marked door contact into a plain contact

Writing one

Start from the programme closest to what you want and change the room list. Two things to watch. Keep area_factor at or above about 1.5, since a floor is rooms plus corridor plus shafts plus the space between them. And prefer from_frontage for the corridor unless you mean a specific length, because a corridor too short for its rooms is the single most common reason a brief does not build.